Semi Automatic Foil Winding Machine Debugging is relatively simple, the logic relationship is not too much, and the switch is less.
But it is still relatively new to people who are not familiar with the device.
Due to the dispersion of the parts and the influence of the assembly process, the installed products cannot meet the performance indicators required by the design.
They need to be discovered, corrected, and compensated through testing and adjustment to achieve the functions and technical indicators specified in the technical documents.
At the same time, debugging can discover problems in product design and process, and raw material defects.
Therefore, the commissioning work is an important process to ensure and realize the function and quality of the product, and to a large extent determines the quality of the whole machine.
-
Understanding each parts of Semi Automatic Foil Winding Machine
The following is a brief introduction to the role of various institutions and the problems often encountered.
The foil winding machine (from front to back) includes eight parts: operation panel, welding mechanism, deviation correcting mechanism, winding mechanism, burr removing mechanism, foil decoiler, layer decoiler, and power distribution cabinet.
-
Semi Automatic Foil Winding Machine lifting
When the equipment is delivered to the customer site,we should lifting machine first.
During the hoisting process, most commissioning personnel are required to provide on-site hoisting instructions.
Customers who are unfamiliar with the equipment may cause heavy lifting or damage to equipment components.
Each piece of equipment has an approximate weight.
to ensure the safety of people and equipment,Do not use rope lifting equipment that exceeds the rated load.
-
Position the equipment
Position the equipment according to the requirements of the customer.
Make sure that the distance between the power distribution cabinet and the outlet of the equipment is not too far (1m is appropriate).
-
Machine wiring
After the position is set, the on-site mechanical assembly inspection and confirmation and electrical assembly inspection and confirmation must be correct.
After the wiring, the wiring and installation of the factory may not be the same person.
Therefore, when wiring is disconnected, the wiring must be solved according to the drawing.
The inconsistent wire number should be marked and replaced to ensure consistency with the electrical drawing.
To avoid unnecessary trouble for the installer.
The field wiring is strictly in accordance with the drawings.
It is indeed inconsistency between the drawing and the actual.
Be sure to mark it and observe the operation phenomenon.
The on-site wiring should be clear and concise, and the results must not be ignored regardless of the process.
The messy wiring will cause trouble for future equipment maintenance and repair.